1948

Malpensa airport

The Aeroporto di Busto joint-stock company was set up in Busto Arsizio with the aim of using the former military runway at Malpensa and including Milan and the Lombardia region in the first international air routes. The first airplane to land was a BZ 308 flown by the aviation ace Stoppani.

1948

1949

The runway was reopened: 1,800 metres of new paving and an old wooden building as the air terminal. The Board of Directors approved new plans for work on infrastructures. A total of 1,366 arrivals and departures were recorded.

1949

1950

Work on a new lighting system in compliance with international regulations was completed at Malpensa, thus opening the airport up to night flights and long-range transatlantic flights. On 2 February, TWA operated its first direct connection with New York.

1950

1951

MALPENSA AIRPORT

The Municipality of Milan became a shareholder of the “Aeroporto di Busto” company acquiring 30 million lire of the company’s stock. Reconstruction of the runway touchdown area in concrete was organised.

1951

1952

MALPENSA AIRPORT

The “Aeroporto di Busto” company and the Italian Government drew up a convention to build, organise and run a civil airport in the heath near Gallarate. Malpensa Airport was classed as a private airport for a period of 20 years.

1952

1953

MALPENSA  AIRPORT

The new air terminal was inaugurated, permitting a distinct improvement in the services offered. The Ministry of Public Works had a building constructed to house flight assistance services and the offices of the Airline companies. Plans to construct the new stretch of road connecting Malpensa to the Varese – Milan motorway were begun.

1953

1954

MALPENSA AIRPORT

Five years after Malpensa opened, the traffic data looks definitely positive: 163,438 passengers, 4,374 flights, 2,758,363 kg of transported cargo.

1954

1955

MALPENSA AIRPORT

The Company Shareholders’ Meeting resolved to change the company name to SEA (Società per Azioni Esercizi Aeroportuali) and to move its registered offices from Busto Arsizio to Milan. The new company took over direct responsibility for providing assistance services to Airline Companies and aircraft.

1955

1956

MALPENSA AIRPORT

The Ministry of Defence authorised the building of a second runway and a new taxiway at Malpensa Airport. Work started on the enlargement of the air terminal, with plans for a restaurant, services for passengers, a freight depot and large viewing terraces for visitors.

1956

1957

LINATE AIRPORT

SEA officially applied to the Government for the licence to build and manage Linate Airport. The Ministry of Defence gave the go-ahead for combined management of the two airports. An increase in SEA’s capital from 500 million to 1 billion lire was decided.

1957

1958

LINATE AIRPORT

Runway no. 2 went into operation at Malpensa and the new air terminal was inaugurated. Detailed planning began for the work to be carried out at Linate, where complex technical solutions would be required: roads needed to be diverted, power lines moved, land expropriated. Work started on construction of the runway and the air terminal.

1958

1960

LINATE AIRPORT

Linate Airport opened. At midnight on 26 June, the first scheduled flight arrived: a DC6 operated by Lebanese International Airways. With the signature of the convention between the Government and SEA, the private status of the Milan airports was recognised.

1960

1961

LINATE & MALPENSA AIRPORT

The first Duty Free Shops in Italy were opened both at Linate and Malpensa. At Linate, a special runway was built, parallel to the main runway, to handle general aviation.

1961

1962

LINATE AIRPORT

At Linate, the air terminal was completed, built on two floors to permit future development of the various blocks according to the increase in traffic. The Italian President officially inaugurated it on 8 December.

1962

1963

LINATE AIRPORT

The domestic flights area of the air terminal at Linate Airport was fully open to traffic. A sharp increase in freight traffic led to the construction of a separate building for shipping agents and a shed covering 11,000 square metres.

1963

1964

LINATE AIRPORT

Ultramodern visual approach slope indicator equipment was installed at Linate to increase landing safety. A foreign exchange office was opened in the Transit Lounge.

1964

1965

LINATE AIRPORT

A system to clear fog from the runway using propane gas was experimented at Linate. At Malpensa, a large new car park was opened to the public and the freight building was enlarged to double its capacity.

1965

1966

LINATE AIRPORT

The SEA President and top management moved their offices to the new building at Linate Airport. SEA began studying a series of operations to enlarge the two airports and adapt their infrastructures to cater for the growth in traffic.

1966

1967

LINATE AIRPORT

Two very new systems to measure and detect visibility on the runways went into operation at Linate. Fully automatic, they provided accurate data for pilots landing in adverse weather conditions.

1967

1968

LINATE AIRPORT

Law no. 515 was approved, prolonging the private legal status of the Milan Airport System for a further 10 years. The runway at Linate was extended by 200 metres to permit more extensive use of DC9s.

1968

1969

LINATE AIRPORT

Seven new boarding gates for international flights were opened at Linate and the aircraft parking apron was enlarged. Work at Malpensa was completed to upgrade the expanded I.L.S. to category II standards.

1969

1970

MALPENSA  AIRPORT

The first jumbo jet, an Alitalia Boeing 747 landed on 16 July. At Linate, passengers increased to over 3 million for the first time. SEA personnel reached 2,000 employees.

1970

1971

MALPENSA  AIRPORT

Law no. 420, extending SEA’s private legal status for another 30 years, was approved on condition that the planned Malpensa south/west expansion be completed within 5 years.

1971

1972

MALPENSA AIRPORT

At Malpensa, the aircraft parking apron was enlarged to permit the simultaneous presence of several Boeing 747s and a new enlargement of the passenger terminal was planned.

1972

1973

MALPENSA AIPORT

The Persian Gulf crisis led to strict anti-piracy and anti-terrorism precautions which slowed down airport business. A new car park for 250 vehicles was opened at Linate.

1973

1974

LINATE AIRPORT

At Linate, the procedure began for purchase of 71,000 sq. m of land south of the runway, required to guarantee fitness for use with the category II standards. A new intercompany canteen was opened as well as new CRAL (Worker’s Recreation and Welfare Centre) premises with sports facilities.

1974

1975

LINATE & MALPENSA AIRPORT

Both at Linate and at Malpensa work to bring the runway lighting systems into compliance with category II standards was completed. New automatic alphanumeric remote indicators were installed.

1975

1976

LINATE AIRPORT

A convention with the government was approved and made executive; it entrusted the work provided for by Law no. 825/73 to SEA, and allocated a contribution of 10,455,000,000 lire for Linate and 7,225,000,000 lire for Malpensa.

1976

1977

LINATE AIRPORT

The second category I.L.S. (Instrumental Landing System) at Linate, which permitted increased operations even when there was fog, was type-approved and therefore went into operation. At Malpensa, a further expansion of the air terminal was planned.

1977

1978

LINATE AIRPORT

Passengers at Linate exceeded 5,000,000. SEA employees increased to 3,000. Building work for refurbishment of the passenger terminal at Linate was contracted out.

1978

1979

MALPENSA AIRPORT

The Lombardia Region approved the plan for renovation and expansion of the air terminal at Malpensa involving the concentration of all arrivals in a new building to be constructed alongside the existing one.

1979

1980

LINATE & MALPENSA AIRPORT

Both at Linate and at Malpensa work commenced on the enlargement of the aircraft parking apron to permit operations with airbuses. Renovation of the air terminal at Linate involved a 75% increase of useful floor space.

1980

1981

MALPENSA AIRPORT

The first supersonic Concorde landed at Malpensa in September. The Arco operating system, to handle all passenger check-in, luggage and flight operations went into effect both at Malpensa and at Linate.

1981

1982

LINATE AIRPORT

From early July until the end of August, Linate Airport was closed to permit resurfacing of the runway and installation of category III landing lights. All flights were transferred to Malpensa where the new arrivals terminal had gone into operation, anticipating the future look of the Milan airports.

1982

1983

LINATE AIRPORT

The I.L.S. at Linate was replaced with new equipment with the functional characteristics required for category III landings. Renovation work continued both at Linate and at Malpensa.

1983

1984

LINATE & MALPENSA AIRPORT

Optical readers were installed at both airports for automatic coding of departing luggage thus increasing the productivity of the handling systems.

1984

1985

MALPENSA AIRPORT

The overall development plan (P.R.G.) known as “Malpensa 2000” was presented to the Ministry of Transport. Law no. 449 was approved, allocating funding of 480 billion lire for the completion of the Malpensa project.

1985

1986

LINATE AIRPORT

At Linate, work commenced on the construction of a multi-storey car park for 1,300 vehicles and a scheme for further enlargement of the arrivals hall in the passenger terminal was planned in detail.

1986

1987

MALPENSA AIRPORT

Two new intercontinental flights to Tokyo and Hong Kong were introduced at Malpensa. The Ministry of Transport approved the Malpensa 2000 overall development plan.

1987

1988

MALPENSA AIRPORT

The Milan airport system exceeded 10 million passengers. Due to excessive congestion at Linate, all charter flights were moved to Malpensa.

1988

1989

MALPENSA AIRPORT

A new lounge for groups was opened at Linate on the departures floor. A third check-in island became operative at Malpensa with new check-in desks. SEA acquired a 20% share in SACBO, the company running Bergamo Airport.

1989

1990

LINATE AIRPORT

For the Italia 90 World Soccer Championship, the Municipality of Milan widened the access road leading to Linate Airport, creating lanes reserved for taxis and public transport. The work related to construction of the Malpensa 2000 passenger terminal was completed.

1990

1991

LINATE AIRPORT

The architect Aldo Rossi was commissioned to upgrade the air terminal at Linate Airport. The Malpensa 2000 project was presented to the European Parliament in Strasburg.

1991

1992

MALPENSA AIRPORT

United Airlines inaugurated daily flights between Malpensa and Washington. The departures lounge was enlarged by 1,250 sq. m and planning began for the Malpensa North expansion.

1992

1993

LINATE AIRPORT

New fingers, permitting docking of aircraft directly to the air terminal, went into operation at Linate. Work on runway 2 was completed at Malpensa.

1993

1994

MALPENSA AIRPORT

The Christophersen Group assessed projects of European interest within the “Reseau des Transports Communautaire “ and placed the Malpensa 2000 projects amongst the first fourteen. BEI granted SEA a line of credit worth 400 billion lire.

1994

1995

MALPENSA AIRPORT

As part of the construction of Malpensa 2000, the Cargo City project was developed to increase freight traffic. Alitalia and Air China began providing flights between Malpensa and Beijing.

1995

1996

LINATE AIRPORT

SEA began the quality certification process, starting from the ramp area, in accordance with the ISO 9001 standard. Planning activities abroad began. SEA was operating in various countries in Eastern Europe.

1996

1997

MALPENSA AIRPORT

With its great experience and capacity for planning and management, SEA offered its services to various foreign countries as a partner for airport management. Contacts were made with the Argentinean authorities. SEA set up an international consortium and won the contract for management of the Argentinean Airport System.

1997

1998

MALPENSA AIRPORT

Malpensa 2000 opened. The new Terminal 1 of the Milano Malpensa Airport was opened on 25 October.

1998

2002

MALPENSA AIRPORT

Essential work for the development of Malpensa was completed: a new hangar, enlargement of the aircraft apron, car parks and work to mitigate the impact on the environment.

2002

2006

MALPENSA AIRPORT

SEA started a process to reorganise the Malpensa Airport structure, devoting Terminal 1 to medium and long-range flights, while Terminal 2 – initially dedicated to low-cost and charter flights – was progressively used, parallel to the growing development of the segment, for high-end low-cost flights.

2006

2008

MALPENSA AIRPORT

SEA celebrated the first 10 years of operations at the new Milano Malpensa Airport on 26 October.

2008

2010

MALPENSA AIRPORT

Work to enlarge Terminal 1 at Milano Malpensa continued: a third satellite, new boarding gates, new coverage of a stretch of the railway link.

2010

2011

MALPENSA AIRPORT

Inauguration of the Porta Magica (Magic Gateway), the new architectural structure celebrating the concept of a “threshold” through a barely visible curtain created by a blade of light that materialises only thanks to clouds of mist, illuminating a large space through which passengers pass to enter or exit the airport.

2011

2011

MALPENSA AIRPORT

Inauguration of the Sheraton Milan Malpensa Airport Hotel, a new hotel concept, with direct access to Malpensa Terminal 1, but at the same time with sensational views of the Alps and Monte Rosa.

2011

2012

MALPENSA AIRPORT

The giant of the skies, the Antonov 225 landed at Milano Malpensa. With its length of 84 metres, the Antonov 225 is the largest aircraft that has ever flown.

2012